MAIN PROJECTS WE PARTICIPATE |
|
PROJECT:GABON AKONDO OILFIELDYEAR: 2014 |
|
PROJECT INTRODUCTION: |
AKONDO Oilfield is located at the northeast of Block Salsich, discovered by 9 wells. Block Salsich is 10km-45km to the northeast of Port Gentil in Gabon, with an exploration area of 1,260.04km2. This project is in order to establish 200K.T/YEAR crude oil central treatment station and appr. 60KM 8” transfer line and one temporary ship stop, point etc. |
CLIENT: |
Sinclair Knight Merz Limited |
ENGINEERING: |
SINOPEC |
COUNTRY: |
KENYA |
VALVE: |
GATE/GLOBE/CHECK/BALL VALVE |
PRESSURE: |
150lb-900lb |
SIZE: |
1/2"-16" |
MATERIAL: |
WCB/A105 |
|
 |
|
|
PROJECT:ANNUAL OUTPUT OF 500,000 TONS PROJECT YEAR: 2014 |
|
PROJECT INTRODUCTION: |
The annual output of 500,000 tons engineering project is located Wushenqi Wushenzhao chemical project area,recorded in January 2011 in the Autonomous Region Development and Reform Commission, the project use the local rich resources of methanol as raw materials, to produce polypropylene, polyethylene and other downstream products of methanol project.The total investment is CNY10,421,760,000 , the plant covers an area of 197 hectares. |
CLIENT: |
ZMMDGS |
ENGINEERING: |
SSEC |
COUNTRY: |
CHINA |
VALVE: |
Floating/Trunnion Mounted Ball Valve |
PRESSURE: |
1/2"-10" |
SIZE: |
150LB-800LB |
MATERIAL: |
CF8M/A105/F316L/LCC/WCB |
|
 |
|
|
PROJECT:SHUIFU-ZHAOTONG GAS PIPELINE PROJECTYEAR: 2014 |
|
PROJECT INTRODUCTION: |
(1) Route:Shuifu-Zhaotong gas pipeline project, length of 260.5km, a designed capacity 497 million m3 per year. (2) Extension: length of 364km. (3) station and ancillary facilities: three gas distribution stations, seven pigging offtake valve chamber;34 shut-off valve chamber in Route and 23 shut-off valve chamber in Extension. |
CLIENT: |
Yunnan Zhongcheng |
ENGINEERING: |
Sichan Hongda Group |
COUNTRY: |
China |
VALVE: |
Ball Valve |
PRESSURE: |
DN25-DN400 |
SIZE: |
PN4.0 |
MATERIAL: |
A105 |
|
 |
|
|
PROJECT:Petroleum PRODUCTS STORAGE TERMINAL IN FISHING PORT, ANGOLAYEAR: 2014 |
|
PROJECT INTRODUCTION: |
The project will be constructed in Luanda, Angola. There are 7 tanks used for Fuel oil,Gasoline and Gas Oil storage. The total tank capacity is 8.17×104m3.Gasoline and Gas Oil will be received from Jetties and Fish port and be transferred to Jetties and Fish portor be transferred by Truck in Terminal. Fuel Oil will be imported and exported from Jetties or be transferred by Truck in Terminal. |
CLIENT: |
Angobetumes |
ENGINEERING: |
CPPE |
COUNTRY: |
Angola |
VALVE: |
Motor Gate Valve/Butterfly Valve/Ball valve/Check Valve |
PRESSURE: |
3/4"-28" |
SIZE: |
150#/800# |
MATERIAL: |
WCB/A105 |
|
 |
|
|
PROJECT:PETROLEUM PRODUCTS STORAGE TERMINALLN MALANGE, ANGOLAYEAR: 2014 |
|
PROJECT INTRODUCTION: |
The project will be constructed in Malange, Angola, 400KM away from the fishing port in Luanda, Angola. The main work includes three diesel storage tanks with each tank capacity as 5000 m3 ,One gasoline storage tank with capacity as 3000 m3. One water tank with capacity as 1,500m3, and process piping, fire systems, loading trestle and other facilities. |
CLIENT: |
Angobetumes |
ENGINEERING: |
CPPE |
COUNTRY: |
Angola |
VALVE: |
Gate/Swing Check Valve |
PRESSURE: |
2"/4"/10" |
SIZE: |
150LB/800LB |
MATERIAL: |
WCB/A105 |
|
 |
|
|
PROJECT:CPECC KAZAKHSTAN ZHANARUOER OILFIELD GAS TREATMENT & UTILIZATION PROJECT II,III PROJECTYEAR: 2013 |
|
PROJECT INTRODUCTION: |
Zhanaruoer Oilfield Gas Treatment & Utilization Project 3th Gas Processing Plant is located in Aktobe, Kazakhstan, affiliated with CNPC-Aktobe Oil and Gas Corporation. The main process units have associated gas booster stations, desulfurization mercaptan device, dehydration mercaptan device, light ends unit, sulfur recovery unit and condensate oil stability & separation device, etc. |
CLIENT: |
The Republic of Kazakhstan Aktobe Binaerman - Koules Co., Ltd |
ENGINEERING: |
CPECC |
COUNTRY: |
KAZAKHSTAN |
VALVE: |
SULFER SHELL TYPE BLOWDOWN VALVE /SULFER CHECK/SULFER VENTING/BALL/SULFER DOUBLE ECCENTRIC BUTTERFLY/SULFER FLANGED TYPE THREE-ECCENTRIC BUTTERFLY/SULFER WORM FLANGED TYPE BUTTERFLY/SULFER WEDGE TYPE SINGLE PLATE GATE/STOP GLOGE VALVE/CHECK VALVE |
PRESSURE: |
PN25-PN63 |
SIZE: |
DN15-DN300 |
MATERIAL: |
WCB/A105/A105N |
|
 |
|
|
PROJECT:EPC WELL GATHERING SYSTEM AT BADRA OILFIELDYEAR: 2013 |
|
PROJECT INTRODUCTION: |
The Badra Oil Field is situated in Wasit governorate, 160 km southeast of Baghdad city. Development of Badra Oil Field Well Gathering System will consist of 17 oil production wells and afferent flow lines, 3 manifolds, 3 trunk lines and CPF Inlet Manifold. |
CLIENT: |
GAZPROM NEFT |
ENGINEERING: |
CPPE |
COUNTRY: |
IRAQ |
VALVE: |
SWING CHECK/BALL VALVE WITH ACTUATOR/MANUAL BALL VALVE/ELECTRIC BALL/TRUNNION MOUNTED BALL/FLOATING BALL/GLOBE/GATE VALVE |
PRESSURE: |
150lb-1500lb |
SIZE: |
1/2"-24" |
MATERIAL: |
A105/F316L |
|
 |
|
|
PROJECT:EPC OIL EXPORT PIPELINE BADRA-GHARRAF AT BADRA OILFIELDYEAR: 2013 |
|
PROJECT INTRODUCTION: |
Project Description:EPC OIL EXPORT PIPELINE BADRA-GHARRAF AT BADRA OILFIELD was developed in TWO (2) phases:Phase I: where minimum 15,000 BOPD will be produced, consists mainly of a gathering system of 8 wells; Central Processing Facilities, Oil Export Pipeline (Badra – Garraf; about 172km) and Tank Farm. The CPF shall be capable to produce up to 170,000 BOPD;Phase II, where 170,000 BOPD will be produced out of 17 wells in total. |
CLIENT: |
GAZPROM NEFT |
ENGINEERING: |
CPPE |
COUNTRY: |
IRAQ |
VALVE: |
FULL-WELDED TRUNNION BALL/SWING CHECK/GLOBE VALVE/INTERLOCK |
PRESSURE: |
150lb-600lb |
SIZE: |
2"-28" |
MATERIAL: |
LF2/WCB/A105N |
|
 |
|
|
PROJECT:GARRAF LIGHT OIL TRANSPOR TATION SYSTEM (LOTS)YEAR: 2013 |
|
PROJECT INTRODUCTION: |
Gharraf oil field is located in Dhi Qar province, and about 5km by northwest from Al Refarei city, 85km by north from Nasiriyah city. BADRA oil pipeline and PETRONAS light oil pipline connect in GHARRAF oil field. PETRONAS oil pipeline project includes a 28” light oil pipeline with length 92km, 6 valve chamber, receiver device, cathodic protection system, station control system, laying optical cable in one ditch, SCADA, solar energy, instrumentation and communication and other main contents. |
CLIENT: |
PCIHBV |
ENGINEERING: |
CPPE |
COUNTRY: |
IRAQ |
VALVE: |
CHECK/PLUG/TRUNNION MOUNTED VALVE |
PRESSURE: |
600lb |
SIZE: |
1"-24" |
MATERIAL: |
WCB/A105 |
|
 |
|
|
PROJECT:ZAWTIKA DEVELOPMENT PROJECTYEAR: 2013 |
|
PROJECT INTRODUCTION: |
ZAWTIKA development project, the total length of pipeline project will be 74.5km, designed capacity is 600MMSCFD, diameter is 28" (711.2mm), material of pipeline is API5LX65, wall thickness grades include 14.3mm,17.5mm, 22.2mm, etc. Outer anticorrosive coating is using 3LPP and 3LPE two types. Line route: after Myammar offshore gas through shallow water view landing point, approach ZBV1 valve chamber, ZOC control center, ZBV2 valve chamber, ZMS metering station and eventually go into PPT gas pipeline in Thailand. |
CLIENT: |
PTTEP INTERNATIONAL LIMITED |
ENGINEERING: |
CPPE |
COUNTRY: |
THAILAND |
VALVE: |
GATE/BALL/BUTTERFLY/CHECK VALVE |
PRESSURE: |
150lb |
SIZE: |
1"-12" |
MATERIAL: |
WCB/A105/QT/COPPER |
|
 |
|
|
|